Select Vessel
Select your vessel to begin the TM200 defect notice processing workflow
Vessel Details
TM200 Defect Notice Input
Paste or type the TM200 defect notice below for AI analysis
AI Processing Defect Notice
Analyzing defect data and generating work instructions...
Analyzing Defect Data
Parsing TM200 content and extracting key information
Knowledge Base Query
Searching for relevant maintenance procedures and standards
Generating Work Instructions
Creating detailed maintenance procedures using AI
Validating Output
Ensuring compliance with naval maintenance standards
Estimated completion: 15 seconds
Work Instruction Editor
Review and edit the AI-generated work instruction
Reference Documents
DPN References
Click to view full details in CMTU system
Previous Work Instructions
WI-PROP-2024-034
Port turbine cooling system repair - HMAS Stuart
SimilarWI-PROP-2024-019
Cooling manifold replacement - HMAS Arunta
RelatedWork Instruction Preview
Review the finalized work instruction before approval
Risk Assessment
Comprehensive risk analysis and mitigation strategies
Safety Risks
High Priority- Electrical isolation required
- Hot surface exposure risk
- Confined space protocols
- Chemical handling procedures
Operational Impact
Medium Impact- 72-hour estimated downtime
- 25% capability reduction
- Alternative coverage needed
- Mission scheduling impact
Financial Impact
Low Risk- Parts: $15,000 AUD est.
- Labor: 48 person-hours
- No warranty implications
- Budget allocation available
Compliance
Medium Priority- Hull inspection required
- QA documentation mandatory
- Environmental compliance
- Safety certification renewal
Mitigation Strategies
Review Status
INTERACTIVE WORK INSTRUCTION
HMS Dragon (D35)
Diesel Generator Port Main Engine - Fuel System Blockage
Generating Final Work Instruction
Creating interactive work instruction documentation...
5 seconds remaining
Submit for Approval
Enter the email address of the approving authority
Fleet Operations Dashboard
Active Work Orders
12Fleet Status
24/27AI Processing Stats
95.2%Work Order Management
Diesel Generator Port Main Engine - Fuel System Blockage
HMS Dragon - Engine Room 2
SAMPSON Radar Array - Calibration Drift Detected
HMS Daring - Operations Room
Galley Equipment - Refrigeration Unit Temperature Fluctuation
HMS Westminster - Galley Deck 2
AI Maintenance Assistant
AI Capabilities
Procedure Generation
Automatically generates maintenance procedures from defect descriptions using military standards
Risk Assessment
Evaluates potential risks and safety considerations for maintenance operations
Parts Identification
Identifies required parts, tools, and materials based on equipment specifications
Time Estimation
Provides accurate time estimates for maintenance tasks based on complexity
Recent AI Activity
Fuel System Analysis completed for HMS Dragon
Generated 12-step procedure • 2 minutes agoRisk Assessment flagged high-voltage work on HMS Daring
Safety protocols updated • 15 minutes agoParts List generated for galley refrigeration repair
8 components identified • 1 hour agoApproval Management
Pending Approvals
Critical Engine Repair - HMS Dragon
Fuel system blockage procedure requires CAPO approval
Radar Calibration - HMS Daring
SAMPSON radar array calibration procedure
Galley Equipment Maintenance - HMS Westminster
Refrigeration unit temperature control adjustment
v0.042